Fair Stand Electrical Plan And Illumination

Just as we have determined our electricity needs in advance when we decorate a house or office, we have to identify it in advance.
You need to determine the amount of electricity you need at your fair stand and at what points you need this electricity stand before the fair and you should make an electricity plan with the firm that will apply your stand.
There must be a receptacle for the refrigerator and water heater in the storage area of ​​your stand.
It is important that you use a computer in the tables and on the reception desk and in the wall socket.
If you do not have a socket at the points you need, you can create additional sockets with an extension cable from another socket in your stand, but this will create image fouling within the stand.
Your illumination should not be more or less. Excess lighting will cause your booth to overheat excessively while a dark stand will not draw attention to your products.




Fair Stand Visual Practices

Fair Stand Visual Practices

WOODEN STAND
Chipboard and Paint Stands:
Boards should never be glued on the stand walls painted directly on stained paint stalls. Although it may seem less costly and quick to apply in the near term, this practice is certainly not the right application. In such stands
The application of the visuals directly on the stand wall causes the visuals to disappear after a while, as well as the appearance of orange peel in the eyes.
In such stands, the pictures are first applied on Foreks / Dakota. Foreks / Dakota on the visuals are applied to the stand walls with double-sided tape according to the size of the image or with very fine-tipped nails at the exhibition area
Flipchart and / or Mdflam stands:
Depending on the size and number of the images to be used in the stand, sometimes the companies that implement the application can apply the visuals on the Foreks / Dakota and stand walls. This application is not wrong. However, from a visual point of view, the most appropriate application on such stands is to apply foil prints directly to the stand walls. In such stands, the images are applied directly to the stand walls. This application is the most correct application from the visual point of view. MODULAR STAND
The modular system consists of stanchion walls on stanchions. On the surface, the application of the images on the stencil provides the most elegant and beautiful view
Strofor (foam writing) in the application of the double-sided tape or silicone can be adhered .. However, due to the heat generated by the lights on the fairground area of ​​the double-sided tape does not give a healthy result and the likelihood of falling letters is very high. You should definitely confirm the sticking of the stand company articles with silicone.
07.10.2017
What should be on Fair Stand!

What should be on Fair Stand!

  • To get information about the stand company, get the most healthy and correct way references and make interviews with the companies that have done business before .. You can get detailed information about the works which stand company has done before by meeting with several companies you will choose from the reference list of the stand company and even visiting them.
  • You have to make sure that the Fair Stand has a substructure and technical staff that can produce the booth you want and can meet your needs.
  • Before giving the job, you should definitely visit the stand company and the production workshop.
  • You must send the electrical system of your stand at least 15 days before the show.
  • At first glance these works will come to you like a waste of time. You will try to express your company for thousands of visitors for 4 days. Considering the importance of your exhibition stand, it will not be a waste of time but profit.
  • All the visuals and logos to be used in your booth must be sent at least 15 days in advance to the company that will hold the exhibition stand, in the sizes and formats that the stand company requires.
  • It is important to know that your stand company is your solution partner and give you all the necessary support in the preparation and production stages. Work initiated with incomplete information will tear you and your stand firm and cause you to be unable to receive your work on time.
  • The staff you will be assigned to the fuer must make business plans to determine beforehand and make a detailed meeting about the fair.
07.10.2017
Total News: 22


© Copyright 2009-2022 | Ideally Architecture - All Rights.

Yakuplu Mah. 65 Sk. No:35 K.2, D:.5, 34524 Beylikdüzü / İstanbul - TÜRKİYE

Quick Contact : +90 212 428 01 52 | Whatsapp +90 533 404 88 89 | E-mail : info@idealmimarlik.com

Sayfa Başı